Quantcast
Channel: Symantec Connect - Backup and Recovery - Discussions
Viewing all articles
Browse latest Browse all 8635

Manual Full Backup_Differential Job Configuration BE2012

$
0
0
I need a solution

Hello All,

I would like to setup a Full Backup w/ Differential job with BE2012.  The full backup will use roughly 1 and 1/3 LTO 4 tapes where the remaining space will appendable in order to be used for following differential jobs which I will schedule for every Wed.  I don't know when the 2nd tape will fill up with differentials so I can't pick a specific reoccuring Full Backup schedule point.  So I'd like to initiate again the Full Backup job manually (by right clicking the job from the job list and selecting run now) when I move to use two more new tapes.  

There is a schedule selection for Full Backup "run now with no recurring schedule" however, I understand that after the job is run, it will be deleted from the job list.  Of course I don't want it to be deleted becase I'd like to run the job again manually as to not have to continually reconfigure a new Full_Differential Job.  How can I do this please?

Also, If I right click the job to "run now" does it apply to the Full Backup part of the job only and allow the schedule differential part reference the new Full Backup bit information?  

tnx


Viewing all articles
Browse latest Browse all 8635

Trending Articles