I need a solution
Prior to 2012 Backup Exec, all jobs (inventory, erase, mount, etc) could be viewed in the Job Monitor window. From there you could cancel that job. In Backup Exec 2012, at the bottom of the Central Adminstration server window, one of the icons shows "Number of Active Jobs". I have an inventory and a tape erase that I would like to stop before the next tape is loaded for a disk to tape backup.
So how do I do this??
Thanks much
Cathy